Wells 1, 2, & 4R PFAS Treatment

EP is helping the Town of Easton install PFAS treatment systems at three impacted well sites. After EP assisted Easton with design, permitting, and bidding of the treatment systems, the project is now in construction with the treatment systems scheduled to be online in 2023. The systems are designed to bring the water system back into compliance with the latest Massachusetts drinking water regulations.