Populatic Water Treatment Plant Update 2023

EP is assisting the Town of Medway as the OPM as an agent and advocate for the Town from conceptual design through construction and commissioning of a new 2.16 MGD Water Treatment Plant for iron and manganese removal, including space for PFAS Treatment to meet future regulations.

Site Construction commenced in June 2022. The foundation is completed, and the green sand filter vessels have been installed. It is anticipated that the contractor will complete the installation of walls and be ready to begin installation of roof trusses by July 2023. The project is on track for startup in April of 2024.