Pages
Team Members
- Deven K. Persaud
- Jason Mai
- Mollie M. Scott
- Steve Shekari
- Margot E. Schoenfelder, PE, AICP
- Christopher P. Grillo, PE
- Tyler W. Schmidt, EIT
- Rebecca R. Heavey
- Stephanie M. Gaudette
- Hannah A. Zafar
- Marcus D. Brunelle
- Meghan N. Jordan
- Sarah I. Bucci, PE
- Annie E. Tucker
- Jill A. Gosnell
- Melinda Lyman-Wright
- Conrad W. Leger
- Scott D. Turner, PE, AICP, LEED AP ND
- Ann P. Kerr, CB
- William M. Watts
- Lauren E. Underwood, PE
- Jacquelyn E. Tupper, PE
- Ryan J. Trahan, PE
- Laura A. Trahan
- Cassandra A. Thompson
- Bruce D. Thibodeau, PE
- Alex J. Richards, PE
- Robert J. Rafferty, PE
- Maria E. Proulx Audi, PE
- Sarah F. Price, PE
- Alston W. C. Potts, PE
- Natalie M. Pommersheim
- Brendan R. Pitts, EIT
- Ryan J. Paul, PE
- Dave Patangia, PE
- William G. Murphy, PE, CPMSM
- Paul C. Millett, PE
- Benjamin J. Mangan, PE
- Alysa J. Longo, PE
- Vern S. Lincoln
- Lisa M. Laque
- Eric A. Kelley, PE, CHMM, LEED GA
- Ziad F. Kary, PE
- Steven J. Ignatowich, EIT
- Benny L. Hung, PE
- David P. Hanlon, MBA, USN(RET)
- Andrew T. Grota, PE
- Marie F. Gertje
- Maria E. George, EIT
- Stephen J. Gabriel
- James D. Fitzgerald, PE, LEED AP
- Deborah B. Dunivan
- Jane R. Davis, PE
- Joshua R. Crabb
- Sabrina L. Castaneda
- Francesca J. Barilla, EIT
- Ryan J. Allgrove, PE
- Fatima Allan
- Chuck Adelsberger, PE, BCEE
- Paul F. Gabriel, PE, LSP
- Mark N. White
- Helen T. Gordon, PE, BCEE
- Ann Marie Petricca, CPG
- Adriaunna M. Fossum
- Adam S. Kran, PE
Office Locations
Services
Projects
- Odor Control Improvements
- New Great Pond Treatment Plant
- Lower Center Interceptor (LCI) Sewer Replacement
- Infiltration and Inflow Program Development
- Replacement of Uncle Tim’s Pedestrian Bridge
- Oyster Reef Restoration
- Tri-Town Regional Water Treatment Plant OPM Services
- Tolland Highway Garage Expansion Pumping Station
- Main Street Improvements
- Union Point
- Shank Painter Road & Route 6 Rehabilitation
- Knowles Crossing Water Treatment Facility
- Water Street Bridge and Culvert
- Town-wide Capacity, Management, Operation, and Maintenance (CMOM) Plan
- Emergency Force Main Break Assistance, Replacement Force Main, and Pump Station Rehabilitation
- Bradford Well Pump Station & Treatment Facility Improvements
- Stormwater Management Services
- Stormwater Drainage Design and Construction
- Emergency Response Services for Catastrophic Sewer Break
- Owner’ Project Manager (OPM) Services for Comprehensive WPCF Upgrade
- Merrimack Valley Gas Explosions Emergency Response Assistance
- Hospital Road Water Mains, Water Storage Tank, and Contaminated Soils Management
- Brant Rock Multi-Modal Improvements
- Oxbow Road Drainage Study & Design
- Pump Station & Horizontal Directional Drilling Tunnel to Peddocks Island/Fort Andrews
- Maquan Street (Route 14)
- Four Corners Sewer Extension
- Worcester Rd Water and Sewer Improvements Phase I
- Elmfield Road & Hop Brook Utilities
- Concord Street Utility, and Roadway Improvements
- West Street Dam Breach & Restoration
- New Municipal Water System Development
- Asset Management & Capital Improvement Plan Preparation
- Lake Shore Drive Culvert Replacement
- Nagog Pond Water Treatment Plant
- Route 6A & Millway Improvements
- Service Material Identification Program
- Design, Permitting, and Inspections for Specialty Minerals Inc.